Hydrodemolition On SR 315 bridge in Columbus, Ohio

At 10000 psi, jets of water cut through concrete during a bridge deck repair on SR 315 in Columbus, Ohio
Author: OhioTransportation; Tags: ODOT construction bridge hydrodemolition

At 10000 psi, jets of water cut through concrete during a bridge deck repair on SR 315 in Columbus, Ohio
Author: OhioTransportation; Tags: ODOT construction bridge hydrodemolition

Amazing machine , and a very brave crew doing demo on the face of the San Vicente Dam, in preparation for the Dam Raise , Demoing the surface will allow a good strong bond between existing concrete and the new concrete that will be applied directly on top .
Author: 49bluespacefish; Tags: San Vicente

www.techniques-haute-pression.fr Hydrodemolition on FedEx runway - Paris's Airport Charles de Gaulle - FRANCE Concrete removal 55cm deep. La puissance de l'eau au service du génie-Civil,...
Author: 123thp; Tags: hydrodemolition airport roissy charles de gaulle aeroport conjet hammelmann thp techniques haute pression concrete removal uhp ultra woma aquajet hydro france decapage

HYDRODEMOLITION by hand-lance at 2500 bar and 2800 bar. www.techniques-haute-pression.fr Concrete removal until 15cm deep - 112m3 - concrete 25MPa La puissance de l'eau au service du Géni-Civil
Author: 123thp; Tags: hydrodemolition 2500 bar hydrodecapage thp ultra haute pression robot pompe woma hammelmann aquajet conjet beton concrete removal

Removing Concrete from a parking garage with 1000 Bar - 180 L/min
Author: mhompert; Tags: Hydrodemolition

Hydro scarifying Liberty Tunnel in Pittsburgh. Project is ARRA funded and is being done by Penn DOT to rehabilitate the tunnel walls and arch. After deep repairs have been jack hammered out, an Ultra High Pressure Hydrodemolition Robot scarifies the surface to remove an old epoxy coating. The machine uses 36000 PSI water at 32 gallons per minute. The process removes loose concrete, dirt, laitance, and opens to pores of the concrete for the new material going back. After the walls have ...
Author: RampartHydroServices; Tags: Stimulus Project ARRA Project Hydrodemolition tunnel Liberty Tubes Hydroscarification walls Shotcrete prep Penn DOT

Example of partial demo'd concrete slab in the Substructure under McCormack Hall. This work will provide access and egress for operational personnel to key points in the Substructure. The demolition and walkway installation is a portion of the Structural Stabilization and Various Repairs project that is ongoing.
Author: UMassBostonFM; Tags: Hydro-Demolition UMass Boston Substructure Facilities Management

Crew Removing 3 Inches of surface , to creat a good bonding surface for new concrete
Author: 49bluespacefish; Tags: HydroDemolition