Message to Industry_0003.wmv

already 1.077 TWh over the 4.5 TWh limit. The average was an extra 1.449 TWh Finally the worst case was 1.670 TWh over the 4.5 TWh limit. Understand that Industry is getting a discounted rate only the first part of its energy consumption. The remainder of its consumption, which is between 19% and 27% beyond the pool limit will be at a to be identified cost. The MOU states: 2.4 SUPPLY OF ADDITIONAL LOAD All New Brunswick electricity needs beyond the Heritage Pool Supply will be supplied ...
Author: jerm24x1; Tags: NB Power GNB Shawn Graham.